Major Projects
University
The university brings more taxes from commerce and industry. Students work on projects that last 7 days.
Professor
The university is the major project for an educated city. It stands on 16 × 16 tiles and takes 4 days to build. You need a School with a college branch.

More taxes
Already at level 1, taxes from commerce and industry rise by 3%. At level 2 it is 5%, at level 3 8%. With every level the university's ring grows by more floors.
Student projects
Your students work on projects. Each costs money and sometimes materials, takes a few days and then lasts 7 days. A few examples:
- Energy efficiency: +3% output of all fusion power plants
- Better blast furnaces: +5% throughput, and blast furnaces can run above full load
- Traffic study: 10% less traffic on all roads
- Criminology: 10% less crime
For level 2 your students need 10 completed projects, for level 3 25. You can build up to 3 universities.
Upgrade levels
| Level | Costs | Upgrade time | What the level adds |
|---|---|---|---|
| 1 | 4 days | Taxes from commerce and industry +3 % | |
| 2 | 2 days | Taxes from commerce and industry +5 % | |
| 3 | 2 days | Taxes from commerce and industry +8 % |
Operation pauses during the upgrade. Costs apply to the upgrade to that level.
